Major repair of a culvert

Major repair of a culvert
Repair of damage to a culvert using permanent formwork in the form of an anchor sheet, employing the “PipeArm” technology
Customer
State Public Institution “Territorial Directorate of Motor Roads of the Novosibirsk Region”
Implementation dates
2018 г.
Location
Novosibirsk District, Novosibirsk Region
  • Objective

    Elimination of vertical and horizontal displacement of reinforced concrete pipe sections that occurred during construction due to insufficient compaction of the pipe foundation or resulted from mechanical impact by construction equipment during pipe backfilling. 

    Solution

    Major repair of a culvert using permanent formwork in the form of a V-LOCK  anchor sheet using the “PipeArm” technology. The technology involves installing a “PipeArm” polymer protective liner with a reinforced reinforcement cage inside the pipe, and injecting a special mineral-binder-based grout into the space between the existing pipe structure and the polymer liner.

    Technology advantages
    • Minimal reduction in the internal diameter of the existing structure
    • Restoration of load-bearing capacity and prevention of structural deterioration
    • Improved water conveyance capacity and prevention of silting due to the low hydraulic resistance of the polymer sleeve

    Installation is completed in the shortest possible time, without requiring traffic closures or the preparation of equipment areas. Operating costs are reduced because the application and restoration of an anti-corrosion coating are not required. The warranty period for the complete scope of work is 6 years, with the possibility of extension based on the results of an inspection. 
     

Do you have any questions?

Need more detailed information, data or advice? Contact us—we will help you find a solution to your task.