Seepage Barrier for Ash Dump No. 3 of the Aksu Power Plant

Seepage Barrier for Ash Dump No. 3 of the Aksu Power Plant
Installation of a seepage barrier for a coal-fired thermal power plant ash pond using HDPE Geomembrane
Customer
JSC "Euro-Asian Energy Corporation" (EEC)
Implementation dates
2013-2017 гг.
Location
Kazakhstan, Pavlodar Region, Aksu-2
  • Task:

    Construction of an environmentally safe hydraulic structure that eliminates the possibility of toxic substances entering groundwater.

    Solution:

    Installation of a seepage barrier using TechPolymer geomembrane TYPE 1 and TYPE 4/1. The geomembrane has sufficient strength and elasticity and provides excellent resistance to temperature effects and ultraviolet radiation, making it possible to create an artificial reservoir of virtually any area, volume, and configuration.