-
Solution
- Construction of a landfill protective screen using geosynthetic materials ("Geogrid RD", bentonite mat "Bentotech", "Geomembrane" type 4/2, type 5/2)
- Construction of a reinforced-soil retaining wall reinforced with "Geogrid RD", using "Stabiligrunt" material for slope reinforcement and plant material "Biomat" for greening the completed structure
- Construction of a degassing system
- Construction of a leachate collection, conveyance and treatment system
- Construction of stormwater drainage, storage and treatment facilities and reservoirs
- Construction of a gas-piston unit and monitoring wells
- Site landscaping and planting.
Task- Reduction of pollutant emissions into the atmosphere
- Protection of groundwater from contamination
- Keeping the landfill body within the boundaries of the allocated site
- Prevention of landfill leachate formation
- Effective biogas removal
- Site improvement and landscaping of the reclaimed landfill.